DocumentCode :
3194992
Title :
BEPCII-The Second Phase Construction of Beijing Electron Positron Collider
Author :
Zhang, C. ; Pei, G.X.
Author_Institution :
BEPCII Team, IHEP, CAS, P.O. Box 918, Beijing 100039, P.R. China
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
131
Lastpage :
135
Abstract :
BEPCII, the second phase construction of the Beijing Electron Positron Collider (BEPC), is a double ring machine with a design luminosity of 1×1033cm-2s-1at 1.89GeV, two orders of magnitude higher than present BEPC. The construction was started in the beginning of 2004 and is scheduled to be completed by the end of 2007. The upgrading of the collider should also provide an improved SR performance with higher beam energy and intensity. The beam currents will be increased to 250mA at E=2.5GeV for the dedicated synchrotron radiation operation. Some key technologies, such as superconducting RF cavity, superconducting micro-beta quadrupole and low impedance vacuum devices etc., are being developed in order to achieve the target of the BEPCII.
Keywords :
Colliding beam devices; Electrons; Impedance; Linear particle accelerator; Positrons; Radio frequency; Storage rings; Structural beams; Superconducting magnets; Synchrotron radiation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1590381
Filename :
1590381
Link To Document :
بازگشت