    Multi-level approach for resource assignment modelling into project management

  • Author

    Ouali, M.-S. ; Mhamedi, A. El ; Binder, Z.

  • Author_Institution
    Lab. d´´Autom. de Grenoble, CNRS, St. Martin d´´Heres, France
  • fYear
    1995
  • fDate
    5-7Jan 1995
  • Firstpage
    311
  • Lastpage
    315
  • Abstract
    This study deals with a resource assignment modelling approach into a multiproject management context. The approach divides the resource assignment complexity into three modelling levels: the structural one, the qualitative one and the quantitative one. Each level deals with one main constraint and uses appropriate modelling tools. A summarizing measure of an average agent treatment load factor is introduced to balance the agent plan
  • Keywords
    hierarchical systems; project management; resource allocation; average agent treatment load factor; multilevel approach; multiproject management context; project management; qualitative level; quantitative level; resource assignment complexity; resource assignment modelling; structural level; Context modeling; Delay; Environmental economics; Environmental management; Flexible manufacturing systems; Industrial economics; Productivity; Project management; Resource management; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Automation and Control, 1995 (I A & C'95), IEEE/IAS International Conference on (Cat. No.95TH8005)
  • Conference_Location
    Hyderabad
  • Print_ISBN
    0-7803-2081-6
  • Type

    conf

  • DOI
    10.1109/IACC.1995.465822
  • Filename
    465822