Multi-level approach for resource assignment modelling into project management
Author
Ouali, M.-S. ; Mhamedi, A. El ; Binder, Z.
Author_Institution
Lab. d´´Autom. de Grenoble, CNRS, St. Martin d´´Heres, France
fYear
1995
fDate
5-7Jan 1995
Firstpage
311
Lastpage
315
Abstract
This study deals with a resource assignment modelling approach into a multiproject management context. The approach divides the resource assignment complexity into three modelling levels: the structural one, the qualitative one and the quantitative one. Each level deals with one main constraint and uses appropriate modelling tools. A summarizing measure of an average agent treatment load factor is introduced to balance the agent plan
Keywords
hierarchical systems; project management; resource allocation; average agent treatment load factor; multilevel approach; multiproject management context; project management; qualitative level; quantitative level; resource assignment complexity; resource assignment modelling; structural level; Context modeling; Delay; Environmental economics; Environmental management; Flexible manufacturing systems; Industrial economics; Productivity; Project management; Resource management; Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Automation and Control, 1995 (I A & C'95), IEEE/IAS International Conference on (Cat. No.95TH8005)
Conference_Location
Hyderabad
Print_ISBN
0-7803-2081-6
Type
conf
DOI
10.1109/IACC.1995.465822
Filename
465822
Link To Document