DocumentCode :
3199326
Title :
Status of the Cryogenic System Commissioning at SNS
Author :
Casagrande, F. ; Campisi, I. ; Gurd, P. ; Hatfield, D. ; Howell, M. ; Stout, D. ; Strong, H. ; Arenius, D. ; Creel, J. ; Dixon, K. ; Ganni, V. ; Knudsen, P.
Author_Institution :
SNS Project, Oak Ridge National Laboratory, TN 37831
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
970
Lastpage :
972
Abstract :
The Spallation Neutron Source (SNS) is under construction at Oak Ridge National Laboratory. The cold section of the Linac consists of 81 superconducting radio frequency cavities cooled to 2.1K by a 2400 Watt cryogenic refrigeration system. The major cryogenic system components include warm helium compressors with associated oil removal and gas management, 4.5K cold box, 7000L liquid helium dewar, 2.1K cold box (consisting of 4 stages of cold compressors), gaseous helium storage, helium purification and gas impurity monitoring system, liquid nitrogen storage and the cryogenic distribution transfer line system. The overall system commissioning strategy and status will be presented.
Keywords :
Compressors; Cryogenics; Helium; Laboratories; Linear particle accelerator; Neutrons; Petroleum; Radio frequency; Refrigeration; Superconducting devices;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1590628
Filename :
1590628
Link To Document :
بازگشت