DocumentCode
3204436
Title
Mixed PBAR Source Operation at the Fermilab Tevatron
Author
Bhat, C.M. ; Capista, D.P. ; Chase, B.E. ; Dey, J.E. ; Kourbanis, I. ; Seiya, K. ; Wu, V.
Author_Institution
Fermilab, Batavia, IL 60510, U.S.A., cbhat@fnal.gov
fYear
2005
fDate
16-20 May 2005
Firstpage
1763
Lastpage
1765
Abstract
Recently we have adopted a scheme, called “Mixed pbar Source Operation” in the Fermilab Main Injector (MI). The purpose of this mode of operation is to transfer pbar bunches from the Recycler and the Accumulator to the Tevatron for collider shots. In this scheme, four 2.5 MHz pbar bunches are injected in to the MI, re-bunched in four groups of 53 MHz bunches at 8 GeV, accelerated to 150 GeV, and coalesced in to four 53 MHz bunches before transfer to the Tevatron. A special magnet ramp is needed in the MI to allow for pbar beam of slightly different 8 GeV energies from the Recycler and the Accumulator. Here we will present the status of this scheme.
Keywords
Acceleration; Colliding beam accelerators; Dynamic range; Large Hadron Collider; Particle beams; Permanent magnets; Proton accelerators; Storage rings; Synchrotrons; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590905
Filename
1590905
Link To Document