Progress Report on the Construction of SOLEIL
Author
Level, M.P. ; Loulergue, A. ; Filhol, J.-M. ; Besson, J.C. ; Brunelle, P. ; Chaput, R. ; Daël, A. ; Nadji, A. ; Denard, J.C. ; Godefroy, J.-M. ; Herbeaux, C. ; Marchand, P. ; Nadolski, L. ; Nagaoka, R. ; Tordeux, M.-A. ; Le Roux, V.
Author_Institution
Synchrotron SOLEIL, L’orme des Merisiers, SAINT-AUBIN - BP 38, F-91192 GIF sur Yvette CEDEX, FRANCE
fYear
2005
fDate
16-20 May 2005
Firstpage
2203
Lastpage
2205
Abstract
SOLEIL is a 2.75 GeV third generation synchrotron radiation facility under construction near Paris. The construction is going towards its completion. The commissionings of the LINAC and of the first transfer line are starting, the booster is already installed in the tunnel and the tests of the equipments are under way, the installation of the storage ring is just beginning. This paper presents the status of the main storage ring equipments: magnets, power supplies, vacuum system, diagnostics, RF system, front ends and insertion devices.
Keywords
Linear particle accelerator; Magnetic separation; Magnets; Power supplies; Radio frequency; Reproducibility of results; Saturation magnetization; Storage rings; Synchrotron radiation; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591057
Filename
1591057
Link To Document