    Progress Report on the Construction of SOLEIL

  • Author

    Level, M.P. ; Loulergue, A. ; Filhol, J.-M. ; Besson, J.C. ; Brunelle, P. ; Chaput, R. ; Daël, A. ; Nadji, A. ; Denard, J.C. ; Godefroy, J.-M. ; Herbeaux, C. ; Marchand, P. ; Nadolski, L. ; Nagaoka, R. ; Tordeux, M.-A. ; Le Roux, V.

  • Author_Institution
    Synchrotron SOLEIL, L’orme des Merisiers, SAINT-AUBIN - BP 38, F-91192 GIF sur Yvette CEDEX, FRANCE
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    2203
  • Lastpage
    2205
  • Abstract
    SOLEIL is a 2.75 GeV third generation synchrotron radiation facility under construction near Paris. The construction is going towards its completion. The commissionings of the LINAC and of the first transfer line are starting, the booster is already installed in the tunnel and the tests of the equipments are under way, the installation of the storage ring is just beginning. This paper presents the status of the main storage ring equipments: magnets, power supplies, vacuum system, diagnostics, RF system, front ends and insertion devices.
  • Keywords
    Linear particle accelerator; Magnetic separation; Magnets; Power supplies; Radio frequency; Reproducibility of results; Saturation magnetization; Storage rings; Synchrotron radiation; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1591057
  • Filename
    1591057