• DocumentCode
    3209809
  • Title

    Production transportation scheduling for process industry

  • Author

    Zhao, Xiaoqiang ; Wan, Yan

  • Author_Institution
    Coll. of Electr. & Inf. Eng., Lanzhou Univ. of Technol., Lanzhou, China
  • Volume
    2
  • fYear
    2010
  • fDate
    13-14 Sept. 2010
  • Firstpage
    225
  • Lastpage
    228
  • Abstract
    Production transportation scheduling problem with constraints is common in process industry. But it is a NP-hard problem. In this paper, the production transportation scheduling problem between a plant that produces intermediate products and a finishing plant which processes the intermediate products in finished goods is studied. Model formulation and solution method are proposed. Using simulated data from a process industry firm, the computational study shows that schedules yield significant cost.
  • Keywords
    finished goods inventory; optimisation; scheduling; transportation; NP hard problem; finishing plant; intermediate product; model formulation; process industry; production transportation scheduling; solution method; Industries; Job shop scheduling; Processor scheduling; Schedules; Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Intelligence and Natural Computing Proceedings (CINC), 2010 Second International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-7705-0
  • Type

    conf

  • DOI
    10.1109/CINC.2010.5643749
  • Filename
    5643749