• DocumentCode
    32177
  • Title

    A Medium-Term Decision Model for DisCos: Forward Contracting and TOU Pricing

  • Author

    Safdarian, Amir ; Fotuhi-Firuzabad, Mahmud ; Lehtonen, Matti

  • Author_Institution
    Electr. Eng. Dept., Sharif Univ. of Technol., Tehran, Iran
  • Volume
    30
  • Issue
    3
  • fYear
    2015
  • fDate
    May-15
  • Firstpage
    1143
  • Lastpage
    1154
  • Abstract
    Time varying prices by motivating customers to reduce their consumption in peak periods propel the electricity industry towards a higher efficiency compared to that of common flat prices. Focusing on time-of-use (TOU) sale prices, this paper establishes a stochastic model for the medium-term decision making problem faced by a distribution company (DisCo). The developed model deals with the DisCo´s decisions on the level of involvement in forward contracts and in the pool as well as the sale prices offered to customers. The demand response to TOU prices is captured using a price elasticity matrix (PEM). The objective is to maximize the DisCo´s profit while the exposure risk imposed by uncertainties is limited to a given level. The model is formulated as a mixed integer linear programming (MILP) problem that can be effectively solved via commercial software packages. A typical Finnish 20-kV urban distribution network is used to demonstrate the effectiveness of the developed model.
  • Keywords
    decision making; decision theory; integer programming; linear programming; matrix algebra; power distribution economics; pricing; stochastic processes; DisCo profit; Finnish urban distribution network; MILP problem; PEM; TOU pricing; commercial software packages; distribution company; electricity industry; exposure risk; forward contracting; medium-term decision making problem; mixed integer linear programming; price elasticity matrix; stochastic model; time varying prices; time-of-use sale prices; urban distribution network; voltage 20 kV; Companies; Electricity; Forward contracts; Load modeling; Pricing; Stochastic processes; Uncertainty; Demand response; distribution company; forward contract; risk management; time-of-use price;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2014.2342373
  • Filename
    6879506