DocumentCode :
3219053
Title :
Regulation requirements with high wind generation penetration in the ERCOT market
Author :
Walling, R.A. ; Freeman, L.A. ; Lasher, W.P.
Author_Institution :
GE Energy, Schenectady, NY
fYear :
2009
fDate :
15-18 March 2009
Firstpage :
1
Lastpage :
7
Abstract :
Wind generation increases the variability and unpredictability of system net load and inevitably leads to changing requirements for ancillary services procurement. One type of ancillary service that is affected by wind generation is regulation. This paper summarizes the results of a major study of wind integration in the ERCOT system, in which the magnitude and timing of changes in regulation requirements are thoroughly analyzed. The adequacy of existing resources to accommodate this regulation requirement was also investigated, and found to be generally sufficient.
Keywords :
power generation economics; power markets; wind power plants; ERCOT market; ancillary services procurement; high wind generation penetration; system net load; wind integration; Councils; Large-scale systems; Load forecasting; Power system reliability; Procurement; Production; Timing; Wind energy generation; Wind forecasting; Wind power generation; wind energy; wind power generation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Systems Conference and Exposition, 2009. PSCE '09. IEEE/PES
Conference_Location :
Seattle, WA
Print_ISBN :
978-1-4244-3810-5
Electronic_ISBN :
978-1-4244-3811-2
Type :
conf
DOI :
10.1109/PSCE.2009.4840221
Filename :
4840221