The office building floor problems on the Wujiang building bulk concrete
Author :
Xingang, Wang ; Zhang Chen ; Lei, Chen
Author_Institution :
Civil Eng. Dept. Nanjing, Nanjing, China
fYear :
2011
fDate :
22-24 April 2011
Firstpage :
4650
Lastpage :
4653
Abstract :
Wujiang building project is made up of the office building, conference center, plaza basement which composed of the two back strip that is divided into three construction segments, the amount of each construction are concrete square section of 3992m3, 1426m3, 3992m3, which belong to a large volume of concrete. In order to avoid the bottom of the temperature cracks and large temperature stress, the process of pouring of concrete floor construction in winter takes heat insulation, temperature monitoring and other measures to control the rising and dropping speed of the concrete temperature.
Keywords :
concrete; construction; cracks; floors; stress analysis; thermal insulation; Wujiang building bulk concrete; concrete floor construction; concrete temperature; conference center; construction segments; heat insulation; office building floor problem; plaza basement; pouring process; temperature cracks; temperature monitoring; temperature stress; bleeding cracks control; construction arrangement site; temperature control; water treatment; work process;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
Type :
conf
DOI :
10.1109/ICETCE.2011.5774608
Filename :
5774608
Link To Document :
بازگشت