DocumentCode
322804
Title
Real experience in the connection of wind power production in distribution network
Author
Criado, R. ; Soto, J. ; Izcue, C. ; Itoiz, C.
Volume
5
fYear
1997
fDate
2-5 June 1997
Abstract
For the implantation of the wind farm at the El Perdon site, numerous measurements were made of wind direction and speed. These measurements made it possible to predict a high number of hours of operation annually and an important energy production. Moreover, it was necessary to determine the ideal connection point to the network that would guarantee the removal (evacuation) of the energy produced and to study the impact of the wind farm in order to preserve the supply quality parameters already set by IBERDROLA. Finally, the results of real operation and the measurements carried out are shown, to prove that the voltage and frequency quality are as forecast.
Keywords
distribution networks; power supply quality; velocity measurement; wind power; El Perdon site; IBERDROLA; Navarra Wind Energy Programme; distribution network; energy production; frequency quality; ideal connection point; supply quality parameters; voltage quality; wind direction measurement; wind power production connection; wind speed measurement;
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
ISSN
0537-9989
Print_ISBN
0-85296-674-1
Type
conf
DOI
10.1049/cp:19970607
Filename
670230
Link To Document