DocumentCode
3232452
Title
Tabletop AgilePlanner: A tabletop-based project planning tool for agile software development teams
Author
Wang, Xin ; Maurer, Frank
Author_Institution
Dept. of Comput. Sci., Univ. of Calgary, Calgary, AB
fYear
2008
fDate
1-3 Oct. 2008
Firstpage
121
Lastpage
128
Abstract
This paper introduces the Tabletop AgilePlanner, an advanced prototype that applies tabletop technology to support collocated and distributed agile planning meetings. By introducing the novel tabletop-based project planning tool, this paper contributes to the agile and tabletop research in threefold: First, it provides real world experience of using a digital tabletop to solve practical problems, not just a demonstration of tabletop capabilities. Second, it shows a multipart usability evaluation that exposes the benefits and limitations of using digital tabletop to develop project planning applications. Third, it expresses some trade-offs that impact the design of the Tabletop AgilePlanner. Since the design experience and trade-offs come from a real practice, this paper provides insights into the construction of real world tabletop applications.
Keywords
groupware; human computer interaction; software prototyping; user interfaces; agile software development team; collocated meeting; distributed agile planning meeting; multipart usability evaluation; project planning tool; tabletop AgilePlanner; Application software; Collaboration; Collaborative work; Keyboards; Meeting planning; Mice; Programming; Prototypes; Software prototyping; Technology planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Horizontal Interactive Human Computer Systems, 2008. TABLETOP 2008. 3rd IEEE International Workshop on
Conference_Location
Amsterdam
Print_ISBN
978-1-4244-2897-7
Electronic_ISBN
978-1-4244-2898-4
Type
conf
DOI
10.1109/TABLETOP.2008.4660194
Filename
4660194
Link To Document