DocumentCode
3234072
Title
Study on engineering cost forecasting of electric power construction based on time response function optimization grey model
Author
Wei, Li ; Ya-nan, Yuan ; Wei-dong, Dong ; Bo, Zhang
Author_Institution
Dept. of Econ. & Manage., North China Electr. Power Univ., Baoding, China
fYear
2011
fDate
27-29 May 2011
Firstpage
58
Lastpage
61
Abstract
This paper discussed an improved gray forecasting model for electric power construction project engineering cost forecasting. A method of time response function optimization is proposed, namely using constraint condition of minimum Euclidean distance of original sequence and simulation value to determine the constant C, build time response function optimization grey forecasting model, and then make better use of the original message. Apply the improved model to forecast the main engineering cost index of electric power construction. Compare this grey forecasting method with regression forecasting method, the results show that improved model has higher prediction accuracy and the effect of actual application is better than before.
Keywords
electricity supply industry; optimisation; project engineering; electric power construction; electric power industry; engineering cost index; grey forecasting model; minimum Euclidean distance; project engineering cost forecasting; regression forecasting method; time response function optimization grey model; electric power construction project; engineering cost; gray model; time response function;
fLanguage
English
Publisher
ieee
Conference_Titel
Communication Software and Networks (ICCSN), 2011 IEEE 3rd International Conference on
Conference_Location
Xi´an
Print_ISBN
978-1-61284-485-5
Type
conf
DOI
10.1109/ICCSN.2011.6014388
Filename
6014388
Link To Document