• DocumentCode
    3246969
  • Title

    An integrated system for scheduling machines and vehicles in an FMS

  • Author

    Finke, G. ; Blazewicz, J.

  • Author_Institution
    Univ. Joseph Fourier, Grenoble, France
  • fYear
    1991
  • fDate
    9-11 Apr 1991
  • Firstpage
    1784
  • Abstract
    An FMS is considered in which the AGV are operated in cyclic mode. This yields an efficient utilization of the AGVs with respect to the throughput rate for the material to be delivered. The FMS produces helicopter party. The aim is to solve simultaneously the machine and the vehicle scheduling problems. A dynamic programming approach can solve this problem in pseudo-polynomial time. In the case of a given production schedule, a polynomial-time algorithm is proposed that constructs a feasible vehicle schedule whenever one exists
  • Keywords
    aerospace industry; automatic guided vehicles; computational complexity; flexible manufacturing systems; helicopters; scheduling; AGV; AGV scheduling; FMS; dynamic programming; helicopter party; machine scheduling; production schedule; pseudo-polynomial-time algorithm; Flexible manufacturing systems; Inspection; Job shop scheduling; Machining; Material storage; Parallel machines; Production; Raw materials; Storage automation; Vehicles;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1991. Proceedings., 1991 IEEE International Conference on
  • Conference_Location
    Sacramento, CA
  • Print_ISBN
    0-8186-2163-X
  • Type

    conf

  • DOI
    10.1109/ROBOT.1991.131881
  • Filename
    131881