DocumentCode
3246969
Title
An integrated system for scheduling machines and vehicles in an FMS
Author
Finke, G. ; Blazewicz, J.
Author_Institution
Univ. Joseph Fourier, Grenoble, France
fYear
1991
fDate
9-11 Apr 1991
Firstpage
1784
Abstract
An FMS is considered in which the AGV are operated in cyclic mode. This yields an efficient utilization of the AGVs with respect to the throughput rate for the material to be delivered. The FMS produces helicopter party. The aim is to solve simultaneously the machine and the vehicle scheduling problems. A dynamic programming approach can solve this problem in pseudo-polynomial time. In the case of a given production schedule, a polynomial-time algorithm is proposed that constructs a feasible vehicle schedule whenever one exists
Keywords
aerospace industry; automatic guided vehicles; computational complexity; flexible manufacturing systems; helicopters; scheduling; AGV; AGV scheduling; FMS; dynamic programming; helicopter party; machine scheduling; production schedule; pseudo-polynomial-time algorithm; Flexible manufacturing systems; Inspection; Job shop scheduling; Machining; Material storage; Parallel machines; Production; Raw materials; Storage automation; Vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Automation, 1991. Proceedings., 1991 IEEE International Conference on
Conference_Location
Sacramento, CA
Print_ISBN
0-8186-2163-X
Type
conf
DOI
10.1109/ROBOT.1991.131881
Filename
131881
Link To Document