    Discrete-Event Simulation (DES) of uncertainty-based time-cost trade-off analysis

  • Author

    Li, Hong-Xian ; Lei, Zhen

  • Author_Institution
    Dept. of Eng. Econ. & Manage., Hohai Univ., Nanjing, China
  • fYear
    2010
  • fDate
    29-31 Oct. 2010
  • Firstpage
    196
  • Lastpage
    199
  • Abstract
    Critical Path Method (CPM) is widely used in construction engineering scheduling. Through calculating Early Start (ES), Early Finish (EF), Late Start (LS), and Late Finish (LF), the duration of a project can be obtained, and critical path can be found. However, in reality, the duration of each activity is uncertain with a distribution, instead of a constant number. Meanwhile, the cost of each activity may vary when the duration of the activity changes, generating different Net Present Value (NPV). In this paper, a Discrete-Event Simulation (DES) methodology is introduced to deal with the uncertainty-based time-cost trade-off (TCT) analysis in construction scheduling problem. An example is stated to verify the proposed methodology.
  • Keywords
    civil engineering; critical path analysis; discrete event simulation; scheduling; CPM; DES methodology; NPV; TCT analysis; construction engineering scheduling; critical path method; discrete-event simulation; net present value; uncertainty-based time-cost trade-off analysis; Computational modeling; Indexes; Schedules; Discrete-Event Simulation (DES); Net Present Value (NPV); Time-Cost Trade-off (TCT);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
  • Conference_Location
    Xiamen
  • Print_ISBN
    978-1-4244-6483-8
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2010.5646648
  • Filename
    5646648