Discrete-Event Simulation (DES) of uncertainty-based time-cost trade-off analysis
Author
Li, Hong-Xian ; Lei, Zhen
Author_Institution
Dept. of Eng. Econ. & Manage., Hohai Univ., Nanjing, China
fYear
2010
fDate
29-31 Oct. 2010
Firstpage
196
Lastpage
199
Abstract
Critical Path Method (CPM) is widely used in construction engineering scheduling. Through calculating Early Start (ES), Early Finish (EF), Late Start (LS), and Late Finish (LF), the duration of a project can be obtained, and critical path can be found. However, in reality, the duration of each activity is uncertain with a distribution, instead of a constant number. Meanwhile, the cost of each activity may vary when the duration of the activity changes, generating different Net Present Value (NPV). In this paper, a Discrete-Event Simulation (DES) methodology is introduced to deal with the uncertainty-based time-cost trade-off (TCT) analysis in construction scheduling problem. An example is stated to verify the proposed methodology.
Keywords
civil engineering; critical path analysis; discrete event simulation; scheduling; CPM; DES methodology; NPV; TCT analysis; construction engineering scheduling; critical path method; discrete-event simulation; net present value; uncertainty-based time-cost trade-off analysis; Computational modeling; Indexes; Schedules; Discrete-Event Simulation (DES); Net Present Value (NPV); Time-Cost Trade-off (TCT);
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
Conference_Location
Xiamen
Print_ISBN
978-1-4244-6483-8
Type
conf
DOI
10.1109/ICIEEM.2010.5646648
Filename
5646648
Link To Document