Effectiveness of auxiliary system monitoring & continuous hydrogen scavenging operation on hydrogen-cooled generator at power plant
Author_Institution :
Coal-Fired Power Plant, Electr. Maintenance Sect. (Tech.), Jimah Energy Ventures (JEV), Port Dickson, Malaysia
Abstract :
This paper presents the effectiveness of generator auxiliary system such as seal oil system, stator cooling water system and gas control system with continuous hydrogen scavenging operation for hydrogen-cooled Synchronous Generator at power plant. Effective operation of synchronous generator depends on sufficient cooling medium (hydrogen) inside the casing. Besides that, good sealing system needed to prevent hydrogen gas leakage and sufficient cooling purposes. Deionized water circulated into stator for cooling purposes with emphasized on low conductivity level for prevention of any damage to the copper strands in the stator winding.
Keywords :
electrical conductivity; power plants; stators; synchronous generators; auxiliary system monitoring; continuous hydrogen scavenging operation; copper strands; damage prevention; deionized water; gas control system; hydrogen gas leakage; hydrogen-cooled synchronous generator; low conductivity; power plant; seal oil system; stator cooling water system; stator winding; Control systems; Cooling; Hydrogen; Monitoring; Petroleum; Power generation; Seals; Stators; Synchronous generators; Temperature control; Seal oil; Synchronous generator; deionizer water; purity; scavenging operation;
Conference_Titel :
Energy and Environment, 2009. ICEE 2009. 3rd International Conference on
Conference_Location :
Malacca
Print_ISBN :
978-1-4244-5144-9
Electronic_ISBN :
978-1-4244-5145-6
DOI :
10.1109/ICEENVIRON.2009.5398654