• DocumentCode
    3304098
  • Title

    Hydraulic method for closing steam turbine casings

  • Author

    Sundberg, S. ; Odsberg, H. ; Holst, J. ; Norberg, S.

  • fYear
    35886
  • fDate
    30 Mar-1 Apr1998
  • Firstpage
    144
  • Lastpage
    147
  • Abstract
    One of the most time consuming operations during an outage of a power plant is the maintenance of the steam turbine. In many cases these operations are considered to be on the critical path and hence it is important not only to speed them up but also to make them as predictable as possible. For more than a decade now, hydraulic coupling-bolts have been used by all major turbine manufacturers and power producers in order to shorten outages and to avoid problems related to stuck bolts. Based on this experience and our knowledge in “oil-power” we have developed a system to hydraulically preload the bolts in a steam turbine casing. The authors describe the hydraulic preloading tensioning tool. The bolt, washer, nut and endcover, and the toolset are described
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Power Station Maintenance - Profitability Through Reliability, 1998. First IEE/IMechE International Conference on (Conf. Publ. No. 452)
  • Conference_Location
    Edinburgh
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-699-7
  • Type

    conf

  • DOI
    10.1049/cp:19980077
  • Filename
    674059