• DocumentCode
    330446
  • Title

    Software reliability in integrated substation automation computer system

  • Author

    QinXiang, Gao

  • Author_Institution
    Beijing Electr. Power Coll., China
  • Volume
    1
  • fYear
    1998
  • fDate
    18-21 Aug 1998
  • Firstpage
    68
  • Abstract
    The reliability of computer system is a key problem in substation automation. Software reliability of integrated substation automation computer system (ISACS) is described in this paper. By discussing software reliability modeling and analyses, the ideas and technology of improving software reliability are given
  • Keywords
    computerised control; power engineering computing; software reliability; substations; computer system reliability; integrated substation automation computer system; software reliability; software reliability analyses; software reliability modeling; Application software; Computer errors; Error correction; Hardware; Hazards; Manufacturing industries; Power engineering computing; Power system reliability; Software reliability; Substation automation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power System Technology, 1998. Proceedings. POWERCON '98. 1998 International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    0-7803-4754-4
  • Type

    conf

  • DOI
    10.1109/ICPST.1998.728926
  • Filename
    728926