Performance studies of Three Gorges-Changzhou ±500 kV HVDC project
Author
Xiaoqian, Zhou ; Zehong, Liu
Author_Institution
China Power Grid Dev. Co., China
Volume
1
fYear
1998
fDate
18-21 Aug 1998
Firstpage
472
Abstract
In this paper, the consultant study results of Three Gorges to Changzhou HVDC Project were summarized. The characteristics and performance requirements of this project were introduced. In specifying performance requirements, the special features of this project, conditions and requirements of both side AC systems as well as environment conditions and requirements were considered carefully. The most up to date technology of HVDC and computerized controls were followed. Efforts have been made to promote development of HVDC technology and to minimize the cost of the project with the basis of ensuring security and stability of the AC/DC systems
Keywords
HVDC power transmission; power system security; power system stability; 500 kV; Three Gorges-Changzhou HVDC project; computerized controls; cost minimisation; environment conditions; performance requirements; security; stability; Frequency; HVDC transmission; Power generation; Power grids; Power markets; Power system interconnection; Power system transients; Power systems; Power transmission lines; Stability;
fLanguage
English
Publisher
ieee
Conference_Titel
Power System Technology, 1998. Proceedings. POWERCON '98. 1998 International Conference on
Conference_Location
Beijing
Print_ISBN
0-7803-4754-4
Type
conf
DOI
10.1109/ICPST.1998.729008
Filename
729008
Link To Document