DocumentCode
3328567
Title
Expediting ramp-to-volume production
Author
Balachandran, Hari ; Parker, Jason ; Gammie, Gordon ; Olson, John ; Force, Craig ; Butler, Kenneth M. ; Jandhyala, Sri
Author_Institution
M/S 8714, Texas Instrum. Inc., Dallas, TX, USA
fYear
1999
fDate
1999
Firstpage
103
Lastpage
112
Abstract
High levels of integration have complicated the entire IC manufacturing process. Crucial steps such as ramp to volume production and yield improvement techniques are being challenged. In this paper, a diagnostic system that has been developed and deployed into a production environment is presented. Experiments conducted demonstrating the value of the diagnostic tool and its limitations are presented
Keywords
automatic test pattern generation; boundary scan testing; electron beam testing; fault diagnosis; integrated circuit testing; production testing; ATPG; IC manufacturing process; automated diagnosis; boundary scan fail; diagnostic system; electron beam probing; failure site isolation; high levels of integration; internal scan; production environment; ramp to volume production; wafer probe; yield improvement; Design for testability; Image analysis; Instruments; Integrated circuit yield; Manufacturing processes; Packaging; Photonic crystals; Production systems; Semiconductor device manufacture; Time to market;
fLanguage
English
Publisher
ieee
Conference_Titel
Test Conference, 1999. Proceedings. International
Conference_Location
Atlantic City, NJ
ISSN
1089-3539
Print_ISBN
0-7803-5753-1
Type
conf
DOI
10.1109/TEST.1999.805619
Filename
805619
Link To Document