DocumentCode
334091
Title
Status of the Fermilab fixed target program
Author
Moore, C.D.
Author_Institution
Fermi Nat. Accel. Lab., Batavia, IL, USA
Volume
1
fYear
1997
fDate
12-16 May 1997
Firstpage
141
Abstract
Fermilab is in the midst of an 800 GeV fixed target run involving ten external beam lines and the operation of the pbar source for two additional experiments. Details of the preparation are presented with an emphasis on how changes from the last run have impacted the current run. Statistics and graphical representations show the progress toward meeting the goals of the program. An overview is presented of the external (floods...) and internal (machine instabilities...) challenges encountered during the run
Keywords
nuclear bombardment targets; proton accelerators; storage rings; synchrotrons; Fermilab fixed target program; external beam lines; graphical representations; machine instabilities; pbar source; Data acquisition; Floods; Interference; Large-scale systems; Neutrino sources; Regulators; Statistics; Storms; Structural beams; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-4376-X
Type
conf
DOI
10.1109/PAC.1997.749571
Filename
749571
Link To Document