DocumentCode
3345932
Title
Analysis of dry dock slope stability at different construction stages
Author
Shu-wang, Yan ; Ke-jin, Liu
Author_Institution
Civil Eng. Sch., Tianjin Univ., Tianjin, China
fYear
2010
fDate
26-28 June 2010
Firstpage
911
Lastpage
914
Abstract
Through constructing to refilling the dry dock for the tunnel cross Haihe River in Tianjin Binhai New Area, the slope of the dock will be undergoing three stages, i.e., excavation, water filling and water draining, respectively. The stability of the dry dock slope is studied by using Fellenius method of slices and Bishop simplified method. At the excavation stage, the soil disturbance is considered; at the water filling stage, the capillarity suction lost above the phreatic line is considered; and at the water draining stage, the slope surface is assumed to be the phreatic line, the sudden falling of the water level is considered and the effective stress method is used. The research result has been adopted as the theoretical basis for the design of the project.
Keywords
capillarity; construction; geotechnical engineering; soil; Bishop simplified method; Fellenius method; Haihe River; Tianjin Binhai New Area; capillarity suction; dry dock; phreatic line; slope stability; soil disturbance; water drainage; water excavation; water filling; Civil engineering; Filling; Geology; Hydroelectric power generation; Publishing; Reservoirs; Rivers; Soil; Stability analysis; Stress; capillarity; dry dock; slope stability; suction;
fLanguage
English
Publisher
ieee
Conference_Titel
Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-7737-1
Type
conf
DOI
10.1109/MACE.2010.5535414
Filename
5535414
Link To Document