DocumentCode
3349604
Title
Material substitution selection algorithm for complex equipment assembling production
Author
Xue, Dongjuan ; Huang, Xuewen
Author_Institution
Sch. of Mech. Eng., Dalian Fisheries Univ., Dalian, China
fYear
2010
fDate
26-28 June 2010
Firstpage
3305
Lastpage
3308
Abstract
Aiming at material kitting and substitution reduced by production changes during complex equipment production process and by analysis of material requirements harmony among product BOM, process planning BOM and production planning BOM, the model of material substitution has been established with materials kitting constraint. By using cost-minimizing as optimized purpose and according to material different attributes(design attributes, process attributes and planning attributes) as contain parameters of materials institution, an algorithm rule is designed to select part substitution to make materials selection, match and institution come true and ensure required materials arrived sufficiently and timely. Finally, the solution is proven to be reasonable and effective in an application example.
Keywords
assembling; minimisation; process planning; product design; production equipment; production planning; complex equipment assembling production; cost-minimizing technique; material substitution selection algorithm; materials kitting constraint; process planning BOM; product BOM; production planning BOM; Aerospace materials; Aircraft; Assembly systems; Bills of materials; Costs; Job shop scheduling; Manufacturing processes; Mechanical engineering; Process planning; Production planning; Assembling; Equipmen; Materials Kitting; Substitution;
fLanguage
English
Publisher
ieee
Conference_Titel
Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-7737-1
Type
conf
DOI
10.1109/MACE.2010.5535623
Filename
5535623
Link To Document