• DocumentCode
    3349604
  • Title

    Material substitution selection algorithm for complex equipment assembling production

  • Author

    Xue, Dongjuan ; Huang, Xuewen

  • Author_Institution
    Sch. of Mech. Eng., Dalian Fisheries Univ., Dalian, China
  • fYear
    2010
  • fDate
    26-28 June 2010
  • Firstpage
    3305
  • Lastpage
    3308
  • Abstract
    Aiming at material kitting and substitution reduced by production changes during complex equipment production process and by analysis of material requirements harmony among product BOM, process planning BOM and production planning BOM, the model of material substitution has been established with materials kitting constraint. By using cost-minimizing as optimized purpose and according to material different attributes(design attributes, process attributes and planning attributes) as contain parameters of materials institution, an algorithm rule is designed to select part substitution to make materials selection, match and institution come true and ensure required materials arrived sufficiently and timely. Finally, the solution is proven to be reasonable and effective in an application example.
  • Keywords
    assembling; minimisation; process planning; product design; production equipment; production planning; complex equipment assembling production; cost-minimizing technique; material substitution selection algorithm; materials kitting constraint; process planning BOM; product BOM; production planning BOM; Aerospace materials; Aircraft; Assembly systems; Bills of materials; Costs; Job shop scheduling; Manufacturing processes; Mechanical engineering; Process planning; Production planning; Assembling; Equipmen; Materials Kitting; Substitution;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-7737-1
  • Type

    conf

  • DOI
    10.1109/MACE.2010.5535623
  • Filename
    5535623