    Study on constructing surveillance system of progress deviation in the key construction projects

  • Author

    Hui, Zhao ; Xue-qing, Wang

  • Author_Institution
    Sch. of Manage., Qingdao Technol. Univ., Qingdao, China
  • fYear
    2010
  • fDate
    26-28 June 2010
  • Firstpage
    5074
  • Lastpage
    5078
  • Abstract
    Whether the key construction projects´ progress is ongoing expectably or not will have important influence on the economic development. Aiming at the supervisors´(Microscopic level) insufficiency of the ability in grasping the project progress deviation, based on the balance theory, using the modern computer technology, utilizing the Delphi method and interval estimation method, the paper constructs a progress deviation surveillance system of the key construction projects in the macroscopic level(implemented by official organizations), which will provide powerful safeguard for completing these key construction projects.
  • Keywords
    construction industry; economics; estimation theory; project management; surveillance; Delphi method; balance theory; economic development; interval estimation method; key construction projects; macroscopic level; modern computer technology; progress deviation surveillance system; Decision making; Educational institutions; Government; Investments; Paper technology; Power generation economics; Project management; Risk management; Surveillance; Technology management; key construction projects; progress deviation; surveillance system;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-7737-1
  • Type

    conf

  • DOI
    10.1109/MACE.2010.5535975
  • Filename
    5535975