DocumentCode
3358093
Title
Reserch on SBS asphalt pavement in southwestern mountain
Author
Feng Wuyi ; Liang Naixing ; Cao Yuanwen ; Wang Yu
Author_Institution
Chongqing Jiaotong Univ., Chongqing, China
fYear
2010
fDate
26-28 June 2010
Firstpage
1422
Lastpage
1425
Abstract
The mountain pavement in Southwestern China putts forward strict requirement concerning high temperature stability and water stability of pavement performance. Because it is easy to produce rut, cracks and subsidensce because it´s high temperature and rainy. This paper put forward the new SBS asphalt mixture design, basement design and construction method based on optimal mineral aggregate gradation in the design of pavement of Chendu-Chongqing highway. Indexes of the segment bulit up in 2 years is good, the benefits achievement can be referenced by new highway construction and reconstruction.
Keywords
aggregates (materials); asphalt; cracks; design engineering; rain; road building; roads; workability; Chendu-Chongqing highway; SBS asphalt pavement; basement construction method; basement design; cracks; highway construction; mountain pavement; optimal mineral aggregate gradation; pavement performance; southwestern China; southwestern mountain; subsidensce; temperature stability; water stability; Aggregates; Asphalt; Minerals; Production; Road transportation; Seals; Slurries; Stability; Temperature; Testing; asphalt pavement; high temperature and rainy; mountain pavement; pavement performance;
fLanguage
English
Publisher
ieee
Conference_Titel
Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-7737-1
Type
conf
DOI
10.1109/MACE.2010.5536157
Filename
5536157
Link To Document