DocumentCode
3366530
Title
Being a flexible fab-the key for long-term success
Author
Koren, Pini ; Maik, Tami ; Perez, Shmulik
Author_Institution
Intel Corp., Jerusalem, Israel
fYear
1999
fDate
1999
Firstpage
7
Lastpage
10
Abstract
Fab8 is a mature fab that runs four technologies (3 logic; 1 EPROM) from different generations (0.5-1.0 micron) and approximately 100 products for 10 business units. The complexity of running a multi-technology line with shared resources involves an ongoing decision-making process of priority definition and resource allocation. Therefore, Fab8 has had to develop and implement an agile manufacturing method. This paper describes the flexibility planning process as well as the implementation of the dynamic manufacturing methodology and the supporting systems
Keywords
decision support systems; integrated circuit manufacture; manufacturing resources planning; resource allocation; Fab8; agile manufacturing method; business units; decision-making process; dynamic manufacturing methodology; flexibility planning process; flexible fab; multi-technology line; priority definition; resource allocation; shared resources; Capacity planning; Costs; Decision making; Investments; Performance analysis; Process planning; Production management; Resource management; Risk analysis; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing Conference Proceedings, 1999 IEEE International Symposium on
Conference_Location
Santa Clara, CA
ISSN
1523-553X
Print_ISBN
0-7803-5403-6
Type
conf
DOI
10.1109/ISSM.1999.808725
Filename
808725
Link To Document