A New Approach for Generation Maintenance Scheduling in a Deregulated Power System
Author
Mohammadi, T.N. ; Hassanpour, S.B. ; Hassanpour, S.A. ; Pirmoradian, M.
Author_Institution
South Tehran Branch, Islamic Azad Univ., Tehran
fYear
2005
fDate
21-24 Nov. 2005
Firstpage
1
Lastpage
5
Abstract
This paper presents a dynamic programming methodology for finding the optimum preventive maintenance schedule of generating units in a deregulated power system. The objective function is to maintain the units as earlier as possible. Various constraints such as spinning reserve, duration of maintenance and maintenance crew are being taken into account. In a case study, using the power system of [1] with six generating units, and implying dynamic programming, we obtain one optimum solution and seven other feasible solutions.
Keywords
dynamic programming; maintenance engineering; power stations; scheduling; deregulated power system; dynamic programming methodology; generation maintenance scheduling; maintenance crew; spinning reserve; Availability; Costs; Dynamic programming; ISO; Power generation; Power system reliability; Power systems; Power transmission lines; Preventive maintenance; Scheduling; Dynamic Programming; Maintenance; open systems; scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
TENCON 2005 2005 IEEE Region 10
Conference_Location
Melbourne, Qld.
Print_ISBN
0-7803-9311-2
Electronic_ISBN
0-7803-9312-0
Type
conf
DOI
10.1109/TENCON.2005.301208
Filename
4085338
Link To Document