DocumentCode :
3398319
Title :
Partial discharge measurement and vibration monitoring on power transformer case study on power transformer with high level noise (75.22 dB)
Author :
Solin, I.K. ; Yolanda, O. ; Siregar, R.
Author_Institution :
East Java and Sub Bali Region, PT.PLN (Persero) P3B Jawa-Bali, Sidoarjo, Indonesia
fYear :
2009
fDate :
19-23 July 2009
Firstpage :
521
Lastpage :
524
Abstract :
This paper is a study and share information of partial discharge measurement and vibration monitoring on power transformer. Power transformer is one of the critical components in power plant and transmission power system. Therefore, an appropriate maintenance program should be applied to the transformer in order to make power system more reliable and to prevent transformer failure at early stage. One of the problems concerning the power transformer is high level noise during its operation.
Keywords :
noise; partial discharge measurement; power transformers; vibrations; maintenance program; noise; partial discharge measurement; power plant; power system reliability; power transformer; transformer failure prevention; transmission power system; vibration monitoring; Monitoring; Noise level; Partial discharge measurement; Power transformers; Vibration measurement; Acoustic Signal; Partial Discharge; Sensor; Vibration;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Properties and Applications of Dielectric Materials, 2009. ICPADM 2009. IEEE 9th International Conference on the
Conference_Location :
Harbin
Print_ISBN :
978-1-4244-4367-3
Electronic_ISBN :
978-1-4244-4368-0
Type :
conf
DOI :
10.1109/ICPADM.2009.5252377
Filename :
5252377
Link To Document :
بازگشت