Title :
An integrated ACO approach for the joint production and preventive maintenance scheduling problem in the flowshop sequencing problem
Author :
Benbouzid-Sitayeb, Fatima ; Ammi, Ismaïl ; Varnier, Christophe ; Zerhouni, Noureddine
Author_Institution :
Lab. des Methodes de Conception de Syst. (LMCS), Algiers
fDate :
June 30 2008-July 2 2008
Abstract :
In this paper, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem in permutation flowshops is considered. A newly developed ant-colony algorithm is proposed and analyzed for solving this problem, based on a common representation of production and maintenance data, to obtain a joint schedule that is, subsequently, improved by a new local search procedure. The goal is to optimize a common objective function which takes into account both maintenance and production criteria. We compare the results obtained with our algorithm to those of an integrated genetic algorithm developed in previous works. The results and experiments carried out indicate that the proposed ant-colony algorithm provide very effective solutions for this problem.
Keywords :
flow shop scheduling; genetic algorithms; preventive maintenance; search problems; ant-colony algorithm; flowshop sequencing problem; integrated ACO approach; integrated genetic algorithm; joint production-preventive maintenance scheduling problem; local search procedure; Algorithm design and analysis; Ant colony optimization; Genetic algorithms; Job production systems; Job shop scheduling; Preventive maintenance; Processor scheduling; Production planning; Production systems; Scheduling algorithm; ACO; Flowshop; Integrated approach; Joint scheduling; Preventive maintenance; Production;
Conference_Titel :
Industrial Electronics, 2008. ISIE 2008. IEEE International Symposium on
Conference_Location :
Cambridge
Print_ISBN :
978-1-4244-1665-3
Electronic_ISBN :
978-1-4244-1666-0
DOI :
10.1109/ISIE.2008.4677142