DocumentCode :
3419556
Title :
Program update-Amtrak´s high speed trainset program
Author :
Bell, John G. ; Annechini, Richard J.
fYear :
1997
fDate :
18-20 Mar 1997
Firstpage :
109
Lastpage :
113
Abstract :
Amtrak´s High Speed Trainset Project Office is responsible for overseeing the design, manufacture and delivery of a fleet of twelve to eighteen high-speed trainsets, fifteen high-speed electric locomotives and state-of-the-art maintenance facilities in Washington, New York and Boston (USA). In addition, the Project Office will oversee the implementation of a management services maintenance contract where the carbuilder will be responsible for all maintenance of the trainsets for an initial period of 10 years. The purpose of this paper is to provide an overview of the high-speed trainset program, including the history of the program, the current status of the various program elements, and the schedule to start revenue service. In addition, the authors intend to briefly review the technology being used on the trainset and locomotive systems
Keywords :
electric locomotives; maintenance engineering; project engineering; railways; Amtrak; USA; electric railways; high-speed electric locomotives; high-speed trainsets; maintenance facilities; project update; state-of-the-art; Contracts; Costs; Design engineering; Engineering management; History; Inspection; Job shop scheduling; Manufacturing; Project management; Proposals;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Railroad Conference, 1997., Proceedings of the 1997 IEEE/ASME Joint
Conference_Location :
Boston, MA
Print_ISBN :
0-7803-3854-5
Type :
conf
DOI :
10.1109/RRCON.1997.581391
Filename :
581391
Link To Document :
بازگشت