• DocumentCode
    345208
  • Title

    Performance of the rejuvenated injector control system in SRRC

  • Author

    Chen, C.S. ; Wang, C.J. ; Chen, Jenny ; Chen, J.S. ; Lee, S.H. ; Hu, K.H. ; Hsu, K.T. ; Lin, K.K.

  • Author_Institution
    Synchrotron Radiat. Res. Center, Hsinchu, Taiwan
  • Volume
    2
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    682
  • Abstract
    The original injector control system is a turnkey design and it was separated from the storage ring control system. It is not easy to maintain and install new devices. The control system of injector has been rejuvenated recently. There are two basic requirements for this plan, to provide more efficient and stable light source operation, and to reduce the maintenance resource need. Its implementation will also be helpful for improvement on reliability and control response time. Upgrade injector from 1.3 GeV to 1.5 GeV will be done before the end of 1999. The renewed injector control system will be able to provide improved environment for application program development and new devices installation. Automatic control operation for full energy injection will be implemented in SRRC
  • Keywords
    accelerator control systems; electron accelerators; particle beam injection; storage rings; SRRC; application program development; control response time; maintenance resource need; rejuvenated injector control system; reliability; stable light source operation; storage ring control system; Automatic control; Control systems; Electrical equipment industry; Lattices; Maintenance; Power supplies; Programmable control; Research and development; Storage rings; Synchrotron radiation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1999. Proceedings of the 1999
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-5573-3
  • Type

    conf

  • DOI
    10.1109/PAC.1999.795320
  • Filename
    795320