DocumentCode
345296
Title
Superconducting RF Lab facility upgrades at Los Alamos
Author
Katonak, D.J. ; Rusnak, B.
Author_Institution
Los Alamos Nat. Lab., NM, USA
Volume
2
fYear
1999
fDate
1999
Firstpage
974
Abstract
Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper
Keywords
accelerator cavities; clean rooms; superconducting cavity resonators; LANL; Los Alamos; Los Alamos National Laboratory; cleanroom facilities; extensive contamination control resources; high-cavity fields; high-pressure rinse cleaning process equipment; multi-cell superconducting cavities; prototype cryomodules; superconducting RF Lab facility upgrades; Assembly; Building materials; Circuits; Cleaning; Floors; Laboratories; Personnel; Radio frequency; Steel; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location
New York, NY
Print_ISBN
0-7803-5573-3
Type
conf
DOI
10.1109/PAC.1999.795419
Filename
795419
Link To Document