DocumentCode :
345527
Title :
Operational status and future upgrades of BEPC
Author :
Wu, Y.Z.
Author_Institution :
Inst. of High Energy Phys., Beijing, China
Volume :
1
fYear :
1999
fDate :
1999
Firstpage :
282
Abstract :
In this paper the operational status of Beijing Electron-Positron Collider (BEPC) in recent years is described. The luminosity upgrades have been performed in recent years. By lowering the vertical β function at interaction point the peak luminosity is nearly doubled. The single interaction point in BEPC is also studied experimentally. The results show that beam-beam tune shifts decrease significantly compare to the two IP´s operation. The overall performance of dedicated synchrotron radiation operation is improved by installing new insertion device and optimising the beam lifetime. The future upgrades of BEPC are briefly introduced. The design studies of a new τ-charm factory has been carried out continuously. On the other hand the further upgrade potential based on existing machine is being exploited
Keywords :
colliding beam accelerators; electron accelerators; particle beam dynamics; storage rings; BEPC; Beijing Electron-Positron Collider; beam lifetime; beam-beam tune shifts; dedicated synchrotron radiation operation; insertion device; luminosity upgrades; tau-charm factory; vertical beta function; Detectors; Electromagnetic radiation; Electron beams; Event detection; Linear particle accelerator; Physics; Positrons; Spectroscopy; Storage rings; Synchrotron radiation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location :
New York, NY
Print_ISBN :
0-7803-5573-3
Type :
conf
DOI :
10.1109/PAC.1999.795684
Filename :
795684
Link To Document :
بازگشت