DocumentCode :
345594
Title :
Commissioning of RHIC vacuum systems
Author :
Hseuh, H.C. ; Davis, R. ; Lee, R.C. ; Pate, D. ; Smart, L. ; Todd, R. ; Weiss, D. ; Zigrosser, D.
Author_Institution :
RHIC Project, Brookhaven Nat. Lab., Upton, NY, USA
Volume :
1
fYear :
1999
fDate :
1999
Firstpage :
557
Abstract :
The Relativistic Heavy Ion Collider (RHIC) has two concentric rings 3.8 km in circumference, There are three vacuum systems in RHIC; the insulating vacuum vessels housing the superconducting magnets, the cold beam tubes surrounded by the superconducting magnets, and the warm beam tube sections at the insertion regions and experimental regions. The vacuum requirements and the design of three vacuum systems are described. The experience gained during the commissioning of these vacuum systems is presented with emphasis on locating helium leaks in the long arc insulating vacuum system
Keywords :
colliding beam accelerators; ion accelerators; storage rings; synchrotrons; vacuum apparatus; RHIC vacuum systems; Relativistic Heavy Ion Collider; cold beam tubes; helium leaks; insertion regions; insulating vacuum vessels; long arc insulating vacuum system; superconducting magnets; warm beam tube sections; Boring; Electron tubes; Gold; Helium; Insulation; Particle beam injection; Particle beams; Particle scattering; Superconducting magnets; Vacuum systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location :
New York, NY
Print_ISBN :
0-7803-5573-3
Type :
conf
DOI :
10.1109/PAC.1999.795759
Filename :
795759
Link To Document :
بازگشت