• DocumentCode
    3457803
  • Title

    Application of Catastrophe Series Method in Performance Evaluation for Government-Invested Projects

  • Author

    Xie, Lifang ; Li, Jun

  • Author_Institution
    Central South Univ., Changsha
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    According to the widespread problems of government-invested projects currently, this paper put forward the necessity of objective and overall performance evaluation. Given the example of cusp catastrophe, it analyzes the mechanism of multi-objective evaluation by applying catastrophe theory, establishes multi-hierarchy indicator system of engineering projects by adopting catastrophe series method. The paper also introduced this method to the example of inland waterway projects. The outputs are well in line with the facts. The indicator system is established based on the inner logical relations between catastrophe model internal mechanism and performance objectives. It avoids the subjective influence of weights design. The calculation is quite convenient and well applied in government-invested projects.
  • Keywords
    catastrophe theory; government; project management; series (mathematics); social sciences; catastrophe series method; government-invested project performance evaluation; inner logical relation; multihierarchy indicator system; social development; Aggregates; Bifurcation; Control systems; Forward contracts; Fuzzy logic; Government; Navigation; Project management; Systems engineering and theory; Topology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.1766
  • Filename
    4679955