DocumentCode
3457803
Title
Application of Catastrophe Series Method in Performance Evaluation for Government-Invested Projects
Author
Xie, Lifang ; Li, Jun
Author_Institution
Central South Univ., Changsha
fYear
2008
fDate
12-14 Oct. 2008
Firstpage
1
Lastpage
5
Abstract
According to the widespread problems of government-invested projects currently, this paper put forward the necessity of objective and overall performance evaluation. Given the example of cusp catastrophe, it analyzes the mechanism of multi-objective evaluation by applying catastrophe theory, establishes multi-hierarchy indicator system of engineering projects by adopting catastrophe series method. The paper also introduced this method to the example of inland waterway projects. The outputs are well in line with the facts. The indicator system is established based on the inner logical relations between catastrophe model internal mechanism and performance objectives. It avoids the subjective influence of weights design. The calculation is quite convenient and well applied in government-invested projects.
Keywords
catastrophe theory; government; project management; series (mathematics); social sciences; catastrophe series method; government-invested project performance evaluation; inner logical relation; multihierarchy indicator system; social development; Aggregates; Bifurcation; Control systems; Forward contracts; Fuzzy logic; Government; Navigation; Project management; Systems engineering and theory; Topology;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location
Dalian
Print_ISBN
978-1-4244-2107-7
Electronic_ISBN
978-1-4244-2108-4
Type
conf
DOI
10.1109/WiCom.2008.1766
Filename
4679955
Link To Document