Time-Cost Tradeoffs Method for Hydropower Project Construction
Author :
Yifei Lai ; Junping Jia ; Qianhua Zhang
Author_Institution :
Econ. & Manage. Sch., Wuhan Univ., Wuhan
fYear :
2008
fDate :
12-14 Oct. 2008
Firstpage :
1
Lastpage :
5
Abstract :
On the basis of the enactment data and information in workout plan, there are some traditional time-cost tradeoff methods, which optimize time-cost in the practice projects. It is difficult for these methods to achieve anticipate purpose as a result of the changes of construction conditions. Aiming to the above shortage, on the basis of discussion relative between time and cost, some problems of relative between time and cost in hydropower project construction schedule are analyzed. The paper presents a fuzzy optimizing time-cost tradeoffs method to realize dynamic management by fuzzy cut set, which is a standard for the degree of risk.
Keywords :
fuzzy set theory; hydroelectric power; project management; dynamic management; fuzzy cut set; fuzzy optimizing time-cost tradeoffs method; hydropower project construction; Buildings; Cost function; Frequency; Fuzzy sets; Hydroelectric power generation; Nonhomogeneous media; Optimization methods; Project management; Risk management; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.2455
Filename :
4680644
Link To Document :
بازگشت