• DocumentCode
    347807
  • Title

    Risks involved in reengineering projects

  • Author

    Sneed, Harry M.

  • fYear
    1999
  • fDate
    6-8 Oct 1999
  • Firstpage
    204
  • Lastpage
    211
  • Abstract
    Risk analysis has become a standard requirement for projects in many organizations. To meet this requirement the risks must be known. This paper addresses the pitfalls of software reengineering projects. To this end it summarizes the results of 13 such projects conducted by the author in the past 10 years. The purpose of the study is to identify the major risks involved in reengineering projects and to suggest means of risk reduction
  • Keywords
    project management; risk management; systems re-engineering; organizations; risk analysis; software reengineering projects; system reengineering; Aging; Application software; Costs; Data processing; Data structures; Electrical capacitance tomography; Risk analysis; Risk management; Software systems; Wrapping;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reverse Engineering, 1999. Proceedings. Sixth Working Conference on
  • Conference_Location
    Atlanta, GA
  • Print_ISBN
    0-7695-0303-9
  • Type

    conf

  • DOI
    10.1109/WCRE.1999.806961
  • Filename
    806961