DocumentCode
3480122
Title
Quick response replenishment: a case study
Author
King, Russell E. ; Moon, Kara
Author_Institution
Dept. of Ind. Eng., North Carolina State Univ., Raleigh, NC, USA
Volume
2
fYear
1999
fDate
1999
Firstpage
1341
Abstract
We document a case study based upon an ongoing analysis for a U.S. fiber/fabric manufacturer who is expanding its operations vertically to include cut and sew operations in Mexico. We refer to this vertically integrated manufacturer as VIM. While some of the data have been changed to protect the sources, the story and results themselves are unchanged. More detail on this case can be found in Moon (1999)
Keywords
computer integrated manufacturing; digital simulation; textile industry; case study; fabric manufacturer; fiber manufacturer; quick response replenishment; simulation; vertically integrated manufacturer; Clothing; Computer aided software engineering; Fabrics; Job shop scheduling; Lead time reduction; Marketing and sales; Moon; Packaging; Production; Pulp manufacturing;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference Proceedings, 1999 Winter
Conference_Location
Phoenix, AZ
Print_ISBN
0-7803-5780-9
Type
conf
DOI
10.1109/WSC.1999.816863
Filename
816863
Link To Document