• DocumentCode
    349885
  • Title

    A hybrid method for a parallel-machine scheduling problem

  • Author

    Vignier, Antony ; Sonntag, B. ; Portmann, M.-C.

  • Author_Institution
    ESIAL, Vandoeuvre-les-Nancy, France
  • Volume
    1
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    671
  • Abstract
    The scheduling problem considered consists of determining a feasible schedule when each job is defined with a ready date, a processing time different on each machine and a deadline. They are setup time sequence dependent. The parallel machines are composed of 2 types. The first one is characterized with “cheap” machines, and the second one with “expensive” machines. The objective function is to first find a feasible schedule and then to minimize the cost due to assignment and setup time costs. The method presented in this paper is based on a three-phase heuristic. The first phase is based on an iterative heuristic, the second one on a genetic algorithm and the third one on a branch and bound for post optimization
  • Keywords
    costing; genetic algorithms; iterative methods; production control; assignment cost; branch and bound; costing; genetic algorithm; heuristic; iterative method; job scheduling; objective function; optimization; parallel-machine; production control; setup time cost; Cost function; Genetic algorithms; Iron; Job production systems; Job shop scheduling; Matrix decomposition; Parallel machines; Steel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation, 1999. Proceedings. ETFA '99. 1999 7th IEEE International Conference on
  • Conference_Location
    Barcelona
  • Print_ISBN
    0-7803-5670-5
  • Type

    conf

  • DOI
    10.1109/ETFA.1999.815418
  • Filename
    815418