DocumentCode
3515028
Title
An Mto Planning Model Considering Timing Association Rules in Orders
Author
Zhang, Ren-Qian ; Li, Jing
Author_Institution
Sch. of Econ. & Manage., BeiHang Univ., Beijing
fYear
2007
fDate
21-25 Sept. 2007
Firstpage
6537
Lastpage
6540
Abstract
Due to the uncertainty of future demand, companies have changed their production planning mode from pre-planning to produce according to the accepted orders, which is named as make-to-order (MTO) or build-to-order (BTO). The hypothesis of independent demand, which falls short of the real state, has been widely introduced in the model of traditional production planning. In general, the future demand and current orders are not completely independent. This paper introduces the data mining method of timing association rules to the model of MTO production planning. Through timing association rules, the relevancy of the future demand and current orders is considered and the future order demand can be forecasted from the history order data by association rules. The heuristic algorithm based on genetic algorithm (GA) is proposed to solve the model. A numeric example is built to demonstrate the proposed model and algorithm.
Keywords
data mining; genetic algorithms; production planning; build-to-order; data mining; genetic algorithm; heuristic algorithm; make-to-order planning model; production planning mode; timing association rules; Association rules; Companies; Costs; Data mining; Electronic mail; Genetic algorithms; Production planning; Strategic planning; Timing; Virtual manufacturing;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location
Shanghai
Print_ISBN
978-1-4244-1311-9
Type
conf
DOI
10.1109/WICOM.2007.1604
Filename
4341379
Link To Document