Title :
A Case Study on Joint Replenishment Problem for Slow Moving Spare Parts in a Nuclear Power Plant
Author :
Wang, Lin ; Zeng, Yurong ; Zhang, Jinlong
Author_Institution :
Sch. of Manage., Huazhong Univ. of Sci. & Technol., Wuhan
Abstract :
In most circumstances, the stock-out cost of spare parts can´t be confirmed exactly because of the special characters of continuous production. Service level constrained (s, c, S) inventory model with continue review policy for joint replenishment is analyzed in a nuclear power plant. Comparing with (s, S) policy, its advantage is tested through practical case. At the same time, sensitivity analysis is accomplished and the corresponding means for inventory optimality are put forward for this kind of spare part. The proposed model is successful in decreasing inventories holding costs significantly by modifying the unreasonable purchase applications while maintaining the predefined service level.
Keywords :
costing; inventory management; maintenance engineering; nuclear power stations; sensitivity analysis; inventory optimality; joint replenishment problem; nuclear power plant; sensitivity analysis; service level constrained inventory model; slow moving spare parts; stock-out cost; Computer science; Costs; Data analysis; Energy management; Inventory control; Inventory management; Power generation; Production; Sensitivity analysis; Technology management;
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location :
Shanghai
Print_ISBN :
978-1-4244-1311-9
DOI :
10.1109/WICOM.2007.1619