• DocumentCode
    3516488
  • Title

    Duration/Cost Trade-offs in Project Scheduling with Time-switch Constraints

  • Author

    Jing-wen, Zhang ; Yu, Xu ; Zheng-wen, He

  • fYear
    2006
  • fDate
    5-7 Oct. 2006
  • Firstpage
    313
  • Lastpage
    317
  • Abstract
    The time-switch constraints attract less attention in the discrete time/cost trade-off problems (DTCTP, for short), but these constraints impose specific starting time on the project activities and force them to be active and inactive during specific time periods. Therefore, a more realistic optimization model is set up in this paper, which is the discrete duration/cost trade-offs in project scheduling with time-switch constraints (DDCTPTSC, for short), and then solve the DDCTPTSC by a customization heuristic genetic algorithm. Combining a real-life project example, the analysis results show that time-switch constraints´ impacts on project indirect cost, penalty cost and bonus cost are mostly different from the traditional DTCTP model because of time-switch constraints, moreover, from the viewpoints of both contractors and clients respectively, we discuss that the penalty/bonus intensity makes the effects on both deciding behaviors, the obtained conclusions provide the instructive meaning for them in the project´s negotiation
  • Keywords
    costing; genetic algorithms; project management; duration cost trade-off; heuristic genetic algorithm; optimization model; project scheduling; time-switch constraint; Constraint optimization; Cost function; Genetic algorithms; Helium; Humans; Project management; Resource management; Roads; Duration/Cost trade-offs; Optimization model; Project scheduling; Time-switch constraints;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management Science and Engineering, 2006. ICMSE '06. 2006 International Conference on
  • Conference_Location
    Lille
  • Print_ISBN
    7-5603-2355-3
  • Type

    conf

  • DOI
    10.1109/ICMSE.2006.313929
  • Filename
    4104916