DocumentCode
3530104
Title
Research on construction project process performance measurement
Author
Bai, Jun-feng ; Yang, Xue-ying ; Tao, Li-hua
Author_Institution
Changchun Univ. of Technol., Changchun, China
Volume
Part 3
fYear
2011
fDate
3-5 Sept. 2011
Firstpage
1915
Lastpage
1918
Abstract
Generally, Performance Assessment (PA) of Construction Subject (CS) is based on “Post-Evaluation”. For one-time construction process, PA has limited ability to evaluate the process objectively. The Basic Model of the evaluation upon Process Performance (PP) in Construction Project (CP) was setup in this paper by AHP based on the Fuzzy Evaluation Method, and also by the study of comparison between the Process Performance (PP) concept definition in the construction project and its evaluation, In the mean time, the Model provides the specific guide-lines for evaluation during Construction Project (CP) Performance Assessment (PA) management process.
Keywords
construction; decision making; project management; AHP; construction project performance assessment management; construction project process performance measurement; construction subject; fuzzy evaluation method; post-evaluation; Concrete; Educational institutions; Organizations; Performance evaluation; Presses; Project management; Construction Project (CP); Evaluation of Screening (EOC); Process Performance (PP);
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location
Changchun
Print_ISBN
978-1-61284-446-6
Type
conf
DOI
10.1109/ICIEEM.2011.6035541
Filename
6035541
Link To Document