• DocumentCode
    3585405
  • Title

    Simulation-based wip management versus scheduling for semiconductor manufacturing - a comparison

  • Author

    Lendermann, Peter ; Boon Ping Gan ; Loo Hay Lee

  • Author_Institution
    D-SIMLAB Technol. Pte Ltd., Singapore, Singapore
  • fYear
    2014
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Semiconductor wafer fabrication is one of the most challenging manufacturing environments around because of its complexity and large number of production steps involved as well as its capital intensity and the competitiveness of the semiconductor industry. This paper explains why - as opposed to a scheduling paradigm - simulation-based WIP management in conjunction with real-time dispatching is the more appropriate future approach for operations management in a semiconductor wafer fabrication facility.
  • Keywords
    dispatching; scheduling; semiconductor industry; simulation; work in progress; production steps; real-time dispatching; scheduling; semiconductor manufacturing; semiconductor wafer fabrication; simulation-based WIP management; work in progress; Gallium nitride; Job shop scheduling; Manufacturing; Predictive models; Schedules; Semiconductor device modeling; Timing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    e-Manufacturing and Design Collaboration Symposium (eMDC), 2014
  • Type

    conf

  • Filename
    7081697