DocumentCode
3647489
Title
Hydroelectric power unit simulator for turbine governor testing
Author
V. Bakarić;I. Mišković;K. Horvat
Author_Institution
Brodarski Institute, Av. V. Holjevca 20, Zagreb, Croatia
fYear
2012
fDate
5/1/2012 12:00:00 AM
Firstpage
794
Lastpage
799
Abstract
Computer-based simulator of water turbine and its environment has been developed for the purpose of turbine governor analysis, design and testing. During the final governor testing in the factory, the finished governor cubicle is linked with the hardware-in-the-loop turbine simulator using the signals which will later link it with the real hydroelectric power unit and other systems at the plant. During the earlier development phases, the governor is implemented as a part of the simulator. Besides helping in the governor design and subsequent improvements, the simulator significantly quickens commissioning of the governor system and thus both improves its quality and reduces costs.
Keywords
"Testing","Mathematical model","Load modeling","Real time systems","Hydraulic turbines","Workstations"
Publisher
ieee
Conference_Titel
MIPRO, 2012 Proceedings of the 35th International Convention
Print_ISBN
978-1-4673-2577-6
Type
conf
Filename
6240752
Link To Document