DocumentCode :
3651386
Title :
Challenges in the implementation of a distribution automation project in a model with decentralized operation centers
Author :
Fernando H. Molina;Felipe M. Engelkes;Rodrigo C. de Andrade;Rafael Z. Homma;Renato B. Rolim;Luiz H. C. de Oliveira;Antônio C. de Moraes;Zenildo F. da Silva
Author_Institution :
CELESC D, Florianopolis, Brazil
fYear :
2013
fDate :
6/1/2013 12:00:00 AM
Firstpage :
1
Lastpage :
4
Abstract :
The main objective of this paper is to present the challenges and solutions encountered in the design of the automation distribution project from CELESC, a power utility in southern of Brazil. The main focus of the paper is to present the challenges of the implementation in a decentralized model of operation centers, regarding that CELESC has 16 Distribution Operation Centers, one in each region of the state.
Publisher :
iet
Conference_Titel :
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Type :
conf
DOI :
10.1049/cp.2013.0848
Filename :
6683451
Link To Document :
بازگشت