Title :
Delivering energy through the world longest submarine HV AC cable
Author :
S. B. Author;T. C. Author
Author_Institution :
Rice Univ., Houston, TX, USA
fDate :
7/1/2015 12:00:00 AM
Abstract :
Summary form only given. With a step-out distance of 161 km and a design power of 55MW, Martin Linge offshore gas field in Norway, will be the longest AC submarine cable power supplying an entire offshore Oil and Gas platform from the shore. This field development comprises a platform with a jack up rig and a Floating Storage Offloading unit. This paper discusses the criteria which have been considered to select a power from shore concept instead of an offshore Gas Turbine power plant which is the current practice in the offshore Oil and Gas industry. Since in a first approach, for such long step-out distance, the choice of power from shore would be to select a DC transmission line, the paper discusses the design and the main technical challenges of this long step-out AC transmission development. Finally, the system approach, required for the development of the onshore and offshore part of the project, is described.
Keywords :
"Underwater vehicles","Power cables","Underwater cables","Offshore installations","Lifting equipment","Turbines"
Conference_Titel :
Power & Energy Society General Meeting, 2015 IEEE
DOI :
10.1109/PESGM.2015.7286468