Title :
RCM scheduling optimization for circuit breakers based on LS-SVM
Author :
Yuan Kai;Liu Jian
Author_Institution :
School of Electrical Engineering, Wuhan University, Wuhan City, Hubei Province, China, 430072
Abstract :
Optimization of circuit breakers (CBs) maintenance schedule based on RCM can enhance substation reliability and lower maintenance cost. In this paper, a RCM approach based on Least Squares Support Vector Machines (LS-SVM) is proposed. Historical operation data are utilized to build a defects tree. A bi-level optimization algorithm is used to choose LS-SVM parameters. The LS-SVM algorithm is used to predict the distribution of defects before and after scheme optimization using aggregated defect data, outage duration, maintenance operation defect detection rate, etc. After the defect loss is quantified based on an expert scoring method and the Gross Domestic Product to power consumption ratio, a cost effect measurement is used to determine the best scheme. The effect of the proposed approach is verified using a numerical simulation of an electric power corporation.
Keywords :
"Maintenance engineering","Circuit breakers","Power system faults","Power system restoration","Optimization","Substations","Reliability"
Conference_Titel :
Connected Vehicles and Expo (ICCVE), 2014 International Conference on
DOI :
10.1109/ICCVE.2014.7297536