• DocumentCode
    3728862
  • Title

    Realistic manufacturing scheduling - 2

  • Author

    Eva Vallada;Rub?n Ruiz

  • fYear
    2015
  • Firstpage
    117
  • Lastpage
    117
  • Abstract
    The gap between scheduling theory and practice has been long known, recognized and studied. More often than not, elaborated scheduling models and procedures are proven to be extremely effective in controlled and synthetic laboratory problems but rarely applied in practical manufacturing scheduling. Real scheduling problems are varied, big and rich in the number of constraints and special characteristics.
  • Keywords
    "Job shop scheduling","Manufacturing","Schedules","Companies","Optimization","Heuristic algorithms"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Systems Management (IESM), 2015 International Conference on
  • Type

    conf

  • DOI
    10.1109/IESM.2015.7380145
  • Filename
    7380145