• DocumentCode
    3729044
  • Title

    A Multi-Level Capacitated Lot-Sizing Problem with energy consideration

  • Author

    Oussama Masmoudi;Alice Yalaoui;Yassine Ouazene;Hicham Chehade

  • Author_Institution
    ICD, LOSI, Universit? de Technologie de Troyes, France
  • fYear
    2015
  • Firstpage
    1352
  • Lastpage
    1359
  • Abstract
    This paper reports on a new Multi-Level Capacitated Lot-Sizing Problem (MLCLSP) taking into account the energetic aspect. A linear mixed integer programming model is proposed to solve this problem. Since the MLCLSP is NP-hard ([10]), two heuristics, that provide solutions in a reasonable computational time, are developed. In this study, the horizon is split into T periods where each one is characterized by a duration, an electricity cost, a maximum peak power and a demand. To evaluate the performance of the model and the heuristics, computational experiments are presented and numerical results are discussed.
  • Keywords
    "Mathematical model","Linear programming","Manufacturing systems","Power demand","Energy consumption","Job shop scheduling"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Systems Management (IESM), 2015 International Conference on
  • Type

    conf

  • DOI
    10.1109/IESM.2015.7380327
  • Filename
    7380327