DocumentCode
3733085
Title
Material ordering with discount policy integrated with a project scheduling problem
Author
A. Shahsavar;B. Abbasi;N. Zoraghi
Author_Institution
Faculty of Industrial and Mechanical Engineering, Islamic Azad University, Qazvin, Iran
fYear
2015
Firstpage
1223
Lastpage
1226
Abstract
In this study, the integration of total quantity discount policy in materials procurement of a project scheduling problem is considered. The problem is mathematically formulated and a hybrid meta-heuristic method called GA-PSO is developed for the problem. The proposed algorithm is tested on 810 benchmarks and is compared with optimal and near optimal solutions.
Keywords
"Schedules","Genetic algorithms","Biological cells","Benchmark testing","Job shop scheduling","Yttrium","Linear programming"
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
Type
conf
DOI
10.1109/IEEM.2015.7385842
Filename
7385842
Link To Document